Ten Checkpoints Before the All-Hands: A Pexip Event Readiness Playbook
Photo: large corporate town hall broadcast with executive presenting on screen and AV control room monitors, via img.atlasobscura.com
A quarterly all-hands is the highest-visibility workload a Pexip deployment will ever carry. It is also, frequently, the least rehearsed. Day-to-day conferencing is capacity that has already been proven by daily use. A town hall for several thousand employees, with executives presenting from three locations and a live Q&A queue, is a different engineering problem — one that concentrates risk into a forty-five minute window where failure is visible to the entire company.
The following playbook is organized as ten checkpoints, sequenced from planning to post-event review. It is not exhaustive, but teams that work through each of them systematically tend to eliminate the most common failure modes before the broadcast begins.
1. Write the success criteria as numbers, not adjectives
"Reliable" is not a specification. Define the expected peak concurrent participant count, the maximum acceptable join latency, the target audio quality floor, the required recording output, and the tolerance for dropped participants. Include the presenter locations and whether they present from managed room systems or personal devices. These numbers drive every decision that follows, from bandwidth reservation to bridge selection.
2. Load test with the real client mix
Synthetic load that uses a single client type produces misleading results. Real audiences arrive on a mix of desktop clients, mobile devices, browsers, room systems, and PSTN dial-ins. Rehearse with that mix at scale, even if the full-scale test requires temporarily provisioning test accounts across departments. Pay particular attention to the join spike in the final five minutes before start time, which is where capacity planning usually breaks first.
3. Confirm bridge and gateway headroom on the outbound path
The bridge may be sized correctly while the connectivity path is not. Verify gateway capacity for simultaneous recording, streaming, and any external participant ingress. Confirm license positions are valid for the peak count, including any temporary event licensing, and that the licensing service is reachable from the nodes that require it.
4. Test from the edge, not from the data center
Engineers testing from a well-connected corporate lab will not reproduce the experience of employees on home broadband in the Mountain time zone. Recruit testers from several regions and network conditions. Confirm firewall and session border configurations permit the required media paths and that quality-of-service markings survive the WAN handoff.
5. Rehearse with presenters, not only with engineers
Engineers validate infrastructure; presenters validate experience. Schedule a rehearsal in the actual production room, with the actual microphones, at the actual time of day. Confirm camera framing, audio gain, screen-sharing behavior, and what happens when a presenter switches devices mid-session. Give each presenter a one-page card describing how to join, how to mute, and how to signal for help without speaking.
6. Assign live monitoring roles with named people
During the event, roles must be explicit. A typical structure includes an incident commander with authority to make changes, a bridge operator watching participant counts and node health, a network observer watching latency and packet loss, a presenter liaison in the room with the executives, and a communications lead managing internal messaging. Each role needs a named backup. One engineer attempting all five functions is not a plan.
7. Build a fallback ladder rather than a single fallback
A single contingency — "we will switch to audio-only" — is rarely sufficient. Define a graduated ladder: reduce video quality or disable video for the audience, migrate presenters to a pre-provisioned secondary bridge, fall back to a lower-bandwidth participation mode, and finally move to an audio bridge with a shared slide deck distributed separately. Each rung needs a pre-agreed trigger and an owner empowered to call it.
8. Script the communications before you need them
Draft the participant-facing messages in advance: a delay notice, a quality degradation advisory, and a fallback instruction. Pre-position them with the communications lead so they can be issued in seconds rather than drafted under pressure. Separately prepare a short internal escalation note for the IT leadership chain so that executives receive accurate information before rumors reach them.
9. Capture a live timeline during the event
Assign one person to log timestamps: start, presenter joins, any participant count anomalies, any quality complaints, every intervention taken, and the end time. This log is the single most valuable artifact the team will produce. Reconstructed timelines from memory are unreliable, and without a timeline the post-event review becomes an exercise in competing recollections.
10. Run the review within 72 hours
Hold the retrospective while the event is fresh. Structure it around the success criteria defined in checkpoint one, and separate what worked from what should change. Produce two durable outputs: an updated runbook section reflecting anything that surprised the team, and a short list of infrastructure improvements with owners and target dates. Publish both where the team will find them before the next town hall, and add the improvements to the quarter's normal change pipeline rather than carrying them as an unresolved backlog.
The pattern across successful event operations is consistent — the work that prevents failure happens weeks earlier and is largely invisible. The broadcast itself should feel routine to the audience. When it does, the engineering was done correctly.